Traffic Advisory | Balgowan/Curry’s Post Interchange – Temporary Closure
TRAFFIC ADVISORY
N3 TOLL ROUTE • BALGOWAN/CURRYS POST INTERCHANGE•
TEMPORARY CLOSURE OF THE N3 TOLL ROUTE FOR BRIDGE REPAIR WORK
11 AUGUST 2025
11 August 2025 – Between 08H00 and 17H00 on Saturday, 16 August 2025, the N3 Toll
Route will be closed to traffic in both directions at Balgowan Interchange (Bosch Hoek)
while the bridge beam is being replaced.
All traffic will be diverted (off and back onto the N3) using the ramps at the Balgowan
Interchange (Exit 125). Law enforcement officials, assisted by N3TC Route Services, will
manage the temporary closure of the N3 Toll Route.

Schematic of Temporary Road Closure and Diversion
N3TC appeals to motorists to approach the construction area with caution, to pay close
attention to warning signs, and to carefully follow all safety instructions.
For further information on the scheduled repair work, to obtain verified traffic information, or
for emergency assistance, follow @N3Route on X, or contact the 24-hour N3 Helpline on
0800 63 43 57.
NB! The work is largely dependent on the availability of two large cranes required to
replace the concrete beam. Should circumstances change for any reason, the works
may have to be rescheduled.
ENDS.